• Magneto 6310 – Overhauled/Exchange

    Factory Overhauled Magneto

    Core Charge U$250.00

    Processing Time: 3-5 Days after P.O

  • Box of Spark Plug RHM40E

    Champion Aerospace Box of 12 RHM40E Massive Piston Spark Plug

    Lead time 3-5 Days

  • Box of Spark Plug RHM38E

    Champion Aerospace Box of 12 RHM38E Massive Piston Spark Plug

    Lead time 3-5 Days

  • Box of Spark Plug RHB32E

    Champion Aerospace Box of 12 RHB32E Massive Piston Spark Plug

    Lead time 3-5 Days

  • Vela Champion REM38E

    R$480,36

    *Valor para uma vela*

    No Brasil pronto para envio

    ComprarCarregando Feito
  • Filter Element BA-7705

    SPECIFICATIONS
    • Material: Polyurethane
    • Suitable For Use With Fixed Wing Aircraft, BA-7710 Brackett Filter

    Processing Time: 3-5 Days after P.O

  • Filter Element BA8103-1

    SPECIFICATIONS
    • Material: Polyurethane

    • Suitable For Use With:

    Processing Time: 3-5 Days after P.O

  • Filter Element BA4108

    Used on BA4106 assembly.

    Applicable:

    • 120
    • 140
    • 140A
    • 150
    • 150A, B, C, D, E, F, G, H, J, K, L, M
    • A150M
    • 152
    • A152
    • F150G, H, J, K, L, M
    • FA150K, L
    • F152
    • FA152

    Processing Time: 3-5 Days after P.O

  • PT6-100HR INSPECTION KIT

    SPECIFICATIONS
    • Suitable For Use With: PT6 Engine
    • Domestic/Import: Domestic

    Processing time 5-7 Days after P.O

  • Espaço reservado

    800-0001 Fuel Control Box

    New Ahlers Fuel control box (Electronic)

  • Avstar Flow Divider AV2576526-1

    Avstar Flow Divider

    P/N AV2576526-1

  • PWC Filter Kit 3036376

    PWC Filter Kit

    P/N 3036376