Box of Cleveland Brake Lining 066-06600
BOX OF 10 UNITS
SPECIFICATIONS
• Suitable For Use With: 30-95, 30-95A, 30-95B, 30-99, 30-100, 30-28D Brake Assembly
• Domestic/Import: Import
Processing Time: 3-5 Days after P.O
Peças de Trem de Pouso, Rodas, Pastilhas, Pneus, câmaras,rolamentos e mais
Exibindo 25–36 de 57 resultadosSorted by popularity
BOX OF 10 UNITS
SPECIFICATIONS
• Suitable For Use With: 30-95, 30-95A, 30-95B, 30-99, 30-100, 30-28D Brake Assembly
• Domestic/Import: Import
Processing Time: 3-5 Days after P.O
BOX OF 10 UNITS
SPECIFICATIONS
• Suitable For Use With: 30-23, 30-23A, 30-23B, 30-23C, 30-23D, 30-129 Brake Assembly
• Domestic/Import: Import
Processing Time: 3-5 Days after P.O
BOX OF 10 UNITS
• Suitable For Use With: 30-30, 30-55, 30-55B, 30-79, 30-79A, 30-79B, 30-214, 30-214B, 30-224 Brake Assembly
• Domestic/Import: Import
Processing Time: 3-5 Days after P.O
Brake disc used on 6.00-6 Wheel Assembly. Minimum replacement thickness = 0.405″
SPECIFICATIONS
• Thickness: 0.445 in
• Material: Steel
• Finish: Chrome
• Suitable For Use With: 6-6 Wheel Assembly
Processing Time : 3-5 Days after P.O
SPECIFICATIONS
• Thickness: 0.475 in
• Material: Steel
• Finish: Chrome
• Suitable For Use With: Fixed Wing Aircraft
• Domestic/Import: Domestic
AIRCRAFT ELIGIBILITY
• B55
• E55
• 58 Hawker Beechcraft
Processing time: 3-5 Days after P.O
Goodyear Flight Custom II are tough tires for tough aircraft.
Lead time 5-7 days after P.O
AirHawk offers a certified tire for a very good price, it’s conquering the market as the other suppliers struggle with demand and stock levels.
6.00×6 6 PLY
3-5 Days lead time
Hydraulic Pump Overhauled/Exchange
***CORE RETURN REQUIRED***
CORE CHARGE: U$15.000,00